Planning Committees Are Changing: What does the new National Scheme of Delegation mean?

From 31st October 2026, significant changes will take place to the way planning applications are delegated for decision making.

The National Scheme of Delegation will introduce a more consistent approach to deciding which applications are determined by planning officers and which may be referred to Planning Committee. Government guidance states that the intention is for committees to focus on proposals raising significant local issues, while more minor and technical applications are dealt with by officers.

What is changing?

Currently, local planning authorities operate their own schemes of delegation. These can allow ward councillors to ‘call in’ applications for committee consideration or require referral where a certain number of objections are received.

Under the new system, these arrangements will no longer be possible for applications covered by the National Scheme.

Applications will instead fall within two categories.

Schedule 1 – Officer Decisions
Schedule 1 applications must be determined by planning officers.

This includes various householder, minor residential and minor commercial applications, alongside prior approvals, certificates and other specified application types.

For residential proposals, the definition includes developments of between one and nine dwellings on sites smaller than 0.5 hectares, alongside a range of other application types including prior approvals, discharge of conditions, certificates of lawfulness and many reserved matters applications.

Importantly, applications falling within this category will not be capable of being sent to Planning Committee simply because a ward councillor requests a call-in or because a specified number of objections have been received.

Schedule 2 – Committee still possible

This includes planning applications which are not classed as householder, minor commercial or minor residential development, together with certain Section 73 applications, Section 73A applications, listed building consents, advertisement consents, Tree Preservation Order applications and reserved matters associated with large outline permissions.

However, being a Schedule 2 application does not automatically mean that an application will be determined by Planning Committee.

The starting position remains officer determination. Referral to committee can only take place where the requirements of the new Gateway Test are satisfied and the nominated planning officer and nominated committee member agree that referral should be made.

What is the Gateway Test?

For a Schedule 2 application to be considered for referral, it must raise at least one of two issues:

  1. An economic, social or environmental issue of significance to the local area; or
  2. A significant planning matter having regard to the Development Plan and other material considerations

What happens to councillor call-ins?

Existing constitutional arrangements allowing individual councillors to require an application to be heard by Planning Committee will no longer be possible under the new scheme. Similarly, councils will not be able to automatically refer applications to committee simply because a particular number of objections or representations have been received.

Councillors, residents and other interested parties will, of course, still be able to make representations on planning applications. However, an objection or councillor request will no longer provide a route to committee determination.

What does this mean in practice?

For applicants and landowners, the reform should create greater consistency over how applications are determined between different local authority areas.

At the same time, the changes place greater importance on early engagement and the quality of planning representations.

The Optimis Consulting planning team can provide advice on the implications of the new delegation arrangements and assist with planning applications, representations and development strategy.

 


Follow Us

LinkedIn